Uranium Mine Ownership - Africa

(last updated 15 Mar 2010)

Contents:

 

> for old mines, see Decommissioning Data - Africa

> See also: Database Index: Uranium Mining in Sub-Saharan Africa external link (African Development Information Services)


> Explanation of Signs and Symbols

 
BOTSWANA   flag

Mokobaesi / Kraken deposits, Letlhakane Project exploration ongoing

Nov. 27, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:   19,308 t U25,192 t U
Ore grade:   0.013% U0.013% U

> Calculate Mine Feasibility
[ISSUES]

Serule Project exploration ongoing

Nov. 27, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:    16,192 t U
Ore grade:    0.014% U


 
CAMEROON   flag

Kitongo deposit, Poli area exploration halted

Size: 11,130 tonnes U
Ore grade: 0.085% U


 
CENTRAL AFRICAN REPUBLIC   flag

Bakouma Uranium Project exploration ongoing

Size: 15,769 tonnes U (TOTAL)
Ore grade: 0.23% U

Patricia deposit

Size: 10,176 tonnes U (inferred)
Ore grade: 0.17% U
> Download Technical Report June 2007 (1.3M PDF) external link (SEDAR)
[ISSUES]


 
CONGO, Democratic Republic of the   flag

(for old mines, see Decommissioning Data - Congo, DR)


 
GABON   flag

(for old mines, see Decommissioning Data - Gabon)

Mounana reclamation ongoing

(shut down in 1999)
> Aerial view: Google Maps external link new window
[DETAILS] · [ISSUES]

COMUF - Compagnie des Mines d'Uranium de Franceville

Mikouloungou project exploration completed

Size: 4270 tonnes U
Ore grade: 0.311% U


 
GUINEA   flag

Firawa deposit

July 1, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:    4,462 t U
Ore grade:    0.025% U

 
MALAWI   flag

Kayelekera deposit under construction

Jan. 5, 2009Reserves *)Resources (300 ppm cutoff)
provenprobablemeasuredindicatedinferred
Size:3,343 t U7,922 t U3,512 t U9,230 t U1,825 t U
Ore grade:0.11% U0.085% U0.10% U0.061% U0.047% U
*) Reserves contained in Resources
> Download Technical Report: Jan. 5, 2009 (8.8M PDF) external link · Mar. 16, 2007 (3.9M PDF) external link · Feb. 27, 2006 (4.9M PDF) external link · Feb. 24, 2005 (4.7M PDF) external link (SEDAR)

Aerial view: Google Maps external link new window

> Calculate Mine Feasibility
[ISSUES] · [OLD ISSUES]

Kanyika niobium project exploration ongoing

Sep. 2, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:   1119 t U2858 t U
Ore grade:   0.0085% U0.0068% U


 
MALI   flag

Faléa uranium/silver project

May 15, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:   333 t U6,888 t U
Ore grade:   0.064% U0.080% U

> Download Technical Report June 26, 2009 (6.1M PDF) external link (SEDAR)

Samit project

Size: 169 tonnes U (historic)
Ore grade:


 
MOZAMBIQUE   flag

Mavuzi project exploration ongoing


 
NAMIBIA   flag

Engo Valley · Etango · Husab · Ida Dome · Klein Spitzkoppe · Klein Trekkopje · Langer Heinrich · Marenica · Rössing · Rössing South · Trekkopje · Tubas · Tumas · Valencia

(for old mines, see Decommissioning Data - Namibia)

> See also: Spatial Development Initiative: Potential Mining Projects external link (Ministry of Trade and Industry)
> Download: Mineral Resources of Namibia: Nuclear and Fossil Fuels - Uranium external link (2.4M PDF - Geological Survey of Namibia 1999)

 

Rössing operating

End 2007ReservesResources
provenprobablemeasuredindicatedinferred
Size:8,310 t U38,761 t U481 t U25,333 t U12,499 t U
Ore grade:0.042% U0.030% U0.018% U0.022% U0.017% U

Aerial view, mine: Google Maps external link new window
Aerial view, tailings dam: Google Maps external link new window

[ISSUES]

 

Langer Heinrich mine operating

Sep. 24, 2008Reserves *)Resources
provedprobablemeasuredindicatedinferred
Size:15,192 t U10,131 t U16,600 t U11,254 t U35,227 t U
Ore grade:0.051% U0.051% U0.051% U0.051% U0.051% U
*) Reserves contained in Resources
> Download Technical Report: Sep. 26, 2008 (8.3M PDF) external link · Jan. 8, 2007 (3.5M PDF) external link · June 7, 2005 (8.9M PDF) external link · Feb. 24, 2005 (5.1M PDF) external link (SEDAR)

Aerial view: Google Maps external link new window

> Calculate Mine Feasibility
[ISSUES] · [OLD ISSUES]

Langer Heinrich Uranium (Pty) Ltd

 

Trekkopje Uranium Project development planned

License No. 151

Aerial view: Google Maps external link new window

> Calculate Mine Feasibility
[ISSUES]

Trekkopje deposit

Apr. 2007ReservesResources
provenprobablemeasuredindicatedinferred
Size:   3,103 t U1,937 t U
Ore grade:   0.011% U0.011% U

Klein Trekkopje deposit

6 Oct. 2007ReservesResources
provenprobablemeasuredindicatedinferred
Size:887 t U41,503 t U  974 t U
Ore grade:0.012% U0.011% U  0.0076% U

> Download Technical Report Nov. 28, 2006 (3.8M PDF) external link (SEDAR)
> Download Bankable Feasibility Study, Interim Progress Update Report, Feb. 2007 (300k PDF) external link (SEDAR)
> Download Preliminary Assessment April 26, 2007 (2.6M PDF) external link (SEDAR)

 

Valencia deposit exploration halted

Nov. 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:2,769 t U20,500 t U3,115 t U25,923 t U3,231 t U
Ore grade:0.014% U0.013% U0.013% U0.011% U0.011% U

> Download Addendum to June 2009 Technical Report, Jan. 2010: Forsys · SEDAR (1.7M PDF) external link
> Download Technical Report June 23, 2009 (1.9M PDF) external link (SEDAR)
> Download Technical Report May 2009: Forsys (2.6M PDF) external link
> Download Technical Report Jan. 2009 (2.2M PDF) external link (SEDAR)
> Download Technical Report March 2008
> Download Technical Report June 2007: Forsys (6.4M PDF) external link · SEDAR (1.8M PDF) external link
> Download: Technical Report Oct. 24, 2005 (1.9M PDF) external link (SEDAR)

Aerial view: Google Maps external link new window

> Calculate Mine Feasibility
[ISSUES]

 

Klein Spitzkoppe deposit, Karibib District exploration halted

Size: 1217 tonnes U
Ore grade: 0.024% U

Engo Valley Uranium Deposit

Size: 1638 tonnes U (inferred)
Ore grade: 0.029% U

Tubas and Tumas tenements

Tubas project

Size: 14,923 tonnes U (inferred)
Ore grade: 0.019% U

Tumas project

Size: 2,923 tonnes U (indicated+inferred)
Ore grade: 0.029% U

Etango project

(formerly Goanikontes)

July 20, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:  769 t U40,654 t U20,154 t U
Ore grade:  0.018% U0.018% U0.017% U

> Download Technical Report Aug. 31/Sep. 25, 2009 (7.1MB PDF) external link (SEDAR)
> Download Technical Report Feb. 2009 (11.8MB PDF) external link (SEDAR)
> Download Technical Report Sep. 2008 (4.7MB PDF): Bannerman external link · SEDAR external link
> Download Technical Report Feb. 2008 (6.1MB PDF) external link (SEDAR)
> Download Technical Report Oct. 2007 (5.5MB PDF) external link (SEDAR)

> Calculate Mine Feasibility
[ISSUES]

Husab property exploration ongoing

Rössing South

Zone 1
July 2, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:   9,231 t U46,538 t U
Ore grade:   0.045% U0.037% U

> Download Technical Report Feb. 25, 2009 (8.4M PDF) external link (SEDAR)

Zone 2
July 22, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:    46,923 t U
Ore grade:    0.046% U

> Download Technical Report Aug. 24, 2009 (4.9M PDF) external link (SEDAR)

> Calculate Rössing South Mine Feasibility
[ISSUES]

Ida Dome prospect

Aug. 6, 2008ReservesResources
provenprobablemeasuredindicatedinferred
Size:   119 t U9,538 t U
Ore grade:   0.021% U0.018% U

> Download Technical Report Sep. 23, 2008 (4.7M PDF) external link

> Calculate Ida Dome Mine Feasibility
[ISSUES]

Marenica

Mar. 1, 2010ReservesResources
provenprobablemeasuredindicatedinferred
Size:   4,615 t U28,077 t U
Ore grade:   0.015% U0.014% U


 
NIGER   flag

Adrar Emoles · Akouta · Arlit · Azelik · Imouraren · In Gall · Madaouéla · Takardeit · Tin Negouran

(for old mines, see Decommissioning Data - Niger)
[CURRENT ISSUES]

Arlit operating

End 2005ReservesResources
provenprobablemeasuredindicatedinferred
Size:16,716 t U  6,397 t U10,115 t U
Ore grade:0.3% U  0.16% U0.3% U

Aerial view: Google Maps external link new window

SOMAÏR - Société des Mines de l'Aïr

Akouta operating

End 2005ReservesResources
provenprobablemeasuredindicatedinferred
Size:7,909 t U15,737 t U2,544 t U5,725 t U18,718 t U
Ore grade:0.46% U0.43% U0.33% U0.31% U0.25% U

Aerial view: Google Maps external link new window

COMINAK - Compagnie Minière d'Akouta

Imouraren mine under construction

End 2005ReservesResources
provenprobablemeasuredindicatedinferred
Size:  118,100 t U25,500 t U 
Ore grade:  0.11% U0.1% U 

[ISSUES]

Azelik deposit (Teguidda deposit), Agadez region under construction

Size: 12,764 tonnes U
Ore grade:

[ISSUES]

In Gall property

Size: 1,688 tonnes U (inferred)
Ore grade: 0.012% U

Madaouéla deposit, Arlit region exploration halted

Size: 6,191 tonnes U
Ore grade:

Adrar Emoles exploration ongoing

Nov. 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:    19,423 t U
Ore grade:    0.070% U

Tin Negouran exploration ongoing

Nov. 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:  202 t U1913 t U1350 t U
Ore grade:  0.050% U0.015% U0.014% U

Takardeit project exploration ongoing

28 Jan. 2010ReservesResources
provenprobablemeasuredindicatedinferred
Size:    4,231 t U
Ore grade:    0.018% U


 
NIGERIA   flag

Mika

Size: 52 tonnes U (historic)
Ore grade: 0.63% U

Ghumchi

Size: 100 tonnes U (historic)
Ore grade: 0.9% U


 
SENEGAL   flag

Saraya East deposit

Size: 1462 tonnes U (historic)
Ore grade: 0.20% U


 
SOMALIA   flag

Alio Ghelle deposit, Bur Area

Size: 1950 tonnes U (proved reserves), 3400 tonnes U (semi-proved reserves)
Ore grade: 0.076% U (proved reserves)

Mudug Province deposits

Size: 4200 tonnes U (estimated resource)
Ore grade: 0.068% U


 
SOUTH AFRICA   flag

Beatrix · Beaufort West · Blyvooruitzicht tailings project · Bonanza South · Buffelsfontein · Cooke Section · Denny Dalton · Dominion · Driefontein · East Rand tailings project · Ezulwini · Hartebeestfontein · Henkries · Kloof · Old Randfontein Section · Palabora · Potchefstroom · Randfontein · Rietkuil · Ryst Kuil · South Deep · Southern Free State Goldfield · Springbok Flats · Vaal River area · Waterval · Western Area · Western Rand JV · West Rand tailings project

(for old mines, see Decommissioning Data - South Africa)

In South Africa, uranium is a by-product of gold mining.

Historical uranium production to 1996 external link (395k PDF - Chamber of Mines)

Beatrix mine

Beisa Reef mining area

2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:   1031 t U3086 t U
Ore grade:   0.088% U0.081% U

Driefontein mine

Driefontein
(underground)
June 30, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:    4,056 t U
Ore grade:    0.0081% U

Driefontein
(in tailings)
June 30, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:  8,248 t U 312 t U
"Ore" grade:  0.0054% U 0.0023% U

> Aerial view Driefontein: Google Maps external link new window

[ISSUES]

Kloof mine

Kloof
(underground)
June 30, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:    1,367 t U
Ore grade:    0.0038% U

Kloof
(in tailings)
June 30, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:   7,865 t U 
"Ore" grade:   0.0033% U 

> Aerial view Kloof: Google Maps external link new window

[ISSUES]

South Deep mine

South Deep
(underground)
June 30, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:    4,455 t U
Ore grade:    0.0062% U

South Deep
(in tailings)
June 30, 2009
ReservesResources
provenprobablemeasuredindicatedinferred
Size:   3,356 t U 
"Ore" grade:   0.0063% U 

> Aerial view South Deep: Google Maps external link new window

[ISSUES]

Western Area

The uranium recovery plant of the mine was closed in 1998 for economic reasons.

Hartebeestfontein / Buffelsfontein closed

Buffelsfontein
underground 2005
ReservesResources
provenprobablemeasuredindicatedinferred
Size:  3,178 t U1,901 t U 
Ore grade:  0.018% U0.016% U 

Buffelsfontein and
Hartebeestfontein
tailings dams, Dec. 2007
ReservesResources
provenprobablemeasuredindicatedinferred
Size:7,038 t U14,058 t U7,038 t U14,442 t U1,781 t U
"Ore" grade:0.0070% U0.0062% U0.0070% U0.0061% U0.0084% U
(Resources include Reserves!)

> Download Technical Report on the Mine Waste Solutions Tailings Recovery Project March 31, 2008: First Uranium (5.7M PDF) external link · SEDAR (5.7M PDF) external link
> Download Buffelsfontein Technical Report Nov. 1, 2007 (Pre-Feasibility of the Buffelsfontein Tailings Recovery Project): First Uranium (8.2M PDF) external link · SEDAR (8.2M PDF) external link
> Download Buffelsfontein Technical Report Nov. 8, 2006 (2.7M PDF) external link · revised Dec. 5, 2006 (2.7M PDF) external link · revised Jan. 31, 2007 (1.1M PDF) external link · revised May 22, 2007 (4.6M PDF) external link (SEDAR)
> Download Buffelsfontein - Independent Audit Report, Jan. 18, 2006 external link (4.5MB PDF)

> Aerial view Hartebeestfontein / Buffelsfontein tailings dams: Google Maps external link new window

(uranium recovery shut down)
(mining halted after March 9, 2005, earthquake and restarted Nov. 2005)
[ISSUES] · [MORE ISSUES]

Randfontein, Gauteng operating

Ezulwini project (formerly Randfontein Four Shaft)
Jan. 2007ReservesResources
provenprobablemeasuredindicatedinferred
Size:  1,495 t U1,108 t U83,969 t U
Ore grade:  0.061% U0.081% U0.064% U

> Download Technical Report (Preliminary Assessment) Jan. 6, 2009 (5.8M PDF) external link (SEDAR)
> Download Technical Report (Preliminary Assessment) Jun. 5, 2008 (2.7M PDF) external link (SEDAR)
> Download Technical Report Nov. 8, 2006 (1.9M PDF) external link · revised Dec. 5, 2006 (1.9M PDF) external link · revised May 9, 2007 (2.7M PDF) external link (SEDAR)

[ISSUES] · [DECOMM. ISSUES]

Beaufort West deposit - Karoo Basin exploration halted

Size: 23,000 tonnes U
Ore grade: 0.08% U

Palabora

(uranium recovery shut down in August 2001)

Springbok Flats deposit exploration halted

Size: 18,000 tonnes U
Ore grade: 0.06%-0.1% U

Vaal River area mines operating

(Great Noligwa and Kopanang mines; Moab Khotsong, Savuka and Tau Tona mine projects)
End 2007ReservesResources
provedprobablemeasuredindicatedinferred
Size:4,653 t U11,874 t U916 t U48,798 t U7,411 t U
Ore grade:0.029% U0.031% U0.067% U0.020% U0.033% U

[ISSUES]

Bonanza South deposit (Klerksdorp area) idle

Size: 270 tonnes U
Ore grade: 0.0076% U

Dominion deposit (Klerksdorp area) idle

Dec. 31, 2007ReservesResources
provenprobablemeasuredindicatedinferred
Dominion Upper
Size:   10,028 t U15,508 t U
Ore grade:   0.053% U0.026% U
Dominion Lower
Size:   8,832 t U7,127 t U
Ore grade:   0.075% U0.020% U
Dominion Surface Tailings
Size:   346 t U 
"Ore" grade:   0.012% U 

> Download Technical Report March 29, 2008 (5.5M PDF) external link · Technical Report March 2, 2007 (5M PDF) external link · Technical Report Aug. 1, 2006 (3.8M PDF) external link · Technical Report June 14, 2006 (5M PDF) external link · Technical Report Feb. 17, 2006 (7.7M PDF) external link (SEDAR)

[ISSUES] · [OLD ISSUES]

Rietkuil deposit (Klerksdorp area) idle

Dec. 31, 2007ReservesResources
provenprobablemeasuredindicatedinferred
Rietkuil Upper
Size:   18,863 t U15,574 t U
Ore grade:   0.050% U0.042% U
Rietkuil Lower
Size:   5,515 t U15,004 t U
Ore grade:   0.045% U0.036% U

> Download Technical Report Feb. 17, 2006 (7.7M PDF) external link (SEDAR)

Ryst Kuil Uranium Project

Size: 30,385 tonnes U
Ore grade:
[ISSUES]

Denny Dalton uranium/gold project exploration halted

Size: 9350 tonnes U
Ore grade: 0.03% U

Cooke Section / Old Randfontein Section

Nov. 30, 2007ReservesResources
provenprobablemeasuredindicatedinferred
surface dumps
Size: 15,172 t U *)25,983 t U42 t U 
"Ore" grade: 0.018% U *)0.0083% U0.0047% U 
underground
Size:  2,553 t U1,577 t U11,526 t U
Ore grade:  0.034% U0.046% U0.042% U
*) Cooke Dump

> Aerial view Cooke Tailings Dam: Google Maps external link new window

[ISSUES]

Rand Uranium Co. external link

Western Rand Joint Venture projects

[ISSUES]

Mintails West Rand tailings project

Randfontein cluster
Mar. 15, 2010
(in tailings)
ReservesResources
provenprobablemeasuredindicatedinferred
Size:  1700 t U1985 t U1812 t U
"Ore" grade:  0.0050% U0.0067% U0.0046% U

Soweto cluster
Mar. 15, 2010
(in tailings)
ReservesResources
provenprobablemeasuredindicatedinferred
Size:   1954 t U2222 t U
"Ore" grade:   0.0037% U0.0029% U

> Download Technical Report Sep. 17, 2008 (3.3M PDF) external link · Technical Report Oct. 12, 2007 (PDF) external link (Mintails)

> Aerial view West Rand tailings dams: Google Maps external link new window
> Aerial view West Wits pit: Google Maps external link new window

[ISSUES]

East Rand tailings project

Elsburg tailings dam complex
Oct. 8, 2008
(in tailings)
ReservesResources
provenprobablemeasuredindicatedinferred
Size:  5,725 t U  
"Ore" grade:  0.0033% U  

> Download Technical Report Aug. 11, 2008 (3.2M PDF) external link (Mintails)

> Aerial view Elsburg Tailings Dam: Google Maps external link new window

[ISSUES]

Ergo Mines Joint Venture

Blyvooruitzicht tailings project

[ISSUES]

Potchefstroom goldfield

Oct. 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:    62,808 t U
Ore grade:    0.025% U
> Download Technical Report Oct. 2009 (1.6MB SEDAR) external link

Southern Free State Goldfield

Hakkies, Bloemhoek, De Bron and Robijn projects

May 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:    21,808 t U
Ore grade:    0.012% U
> Download Technical Report Oct. 20, 2009 (6M PDF) external link (SEDAR)
> Download Technical Report May 2009 (4.8M PDF) external link (SEDAR)
> Download Technical Report on the Scoping Study for the Bloemhoek Project, May 2008: Witsgold (2.9M PDF) external link· SEDAR (4.5M PDF) external link
> Download Technical Report Nov. 2007: Witsgold (4.5MB PDF) external link · SEDAR (4.5MB PDF) external link

Beisa North Project

July 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:    18,400 t U
Ore grade:    0.066% U
> Download Technical Report June 30, 2009 (2.7M PDF) external link (SEDAR)

[ISSUES]

Waterval project

Feb. 2008ReservesResources
provenprobablemeasuredindicatedinferred
Size:   157 t U120 t U
Ore grade:   0.030% U0.030% U

Henkries deposit

June 30, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:  350 t U792 t U588 t U
Ore grade:  0.052% U0.039% U0.025% U

[ISSUES]


 
TANZANIA   flag

Manyoni project exploration ongoing

(formerly Bahi project)
 ReservesResources
provenprobablemeasuredindicatedinferred
Size:    5,885 t U
Ore grade:    0.013% U

[ISSUES]

Mkuju River project exploration ongoing

Nyota Prospect

26 Jan. 2010ReservesResources
provenprobablemeasuredindicatedinferred
Size:   10,961 t U21,461 t U
Ore grade:   0.044% U0.037% U

> Download Technical Report Dec. 7, 2009 (5.4M PDF) external link · Technical Report Sep. 18, 2009 (7.1M PDF) external link (SEDAR)

> Calculate Nyota Prospect mine feasibility

[ISSUES]


 
ZAMBIA   flag

Bungua · Gwabe · Lumwana · Mutanga (ex Kariba) · Mutanga · Njame · Njame (Chirundu JV)

(for old mines, see Decommissioning Data - South Africa)

 

Lumwana copper project exploration completed

June 2008ReservesResources
provenprobablemeasuredindicatedinferred
Malundwe
Size: 3,464 t U 3,815 t U1,542 t U
Ore grade: 0.10% U 0.081% U0.040% U
Chimiwungo
Size:    1,023 t U
Ore grade:    0.047% U
(Reserves contained in Resources)
> Download Technical Report, June 2008 external link (1.6M PDF - SEDAR) · Technical Report, Aug. 2006 external link (1.4M PDF - SEDAR)
[ISSUES]

Njame, Mutanga, and Bungua deposits

Size: 5414 tonnes U (estimated resources)
Ore grade:

Njame deposit (Chirundu JV)

Large Scale Mining Licence 12634-HQ-LML

Nov. 18, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:  801 t U791 t U1304 t U
Ore grade:  0.030% U0.021% U0.020% U

[ISSUES]

Chirundu Joint Venture

Gwabe deposit

Large Scale Mining Licence 12634-HQ-LML

March 20, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:  269 t U962 t U115 t U
Ore grade:  0.020% U0.027% U0.015% U

Chirundu Joint Venture

Mutanga (ex Kariba) project exploration halted

March 12, 2009ReservesResources
provenprobablemeasuredindicatedinferred
Size:  765 t U2,238 t U5,077 t U
Ore grade:  0.041% U0.027% U0.020% U
> Download Technical Report March 19, 2009 (10.5M PDF) external link (SEDAR)

[ISSUES]
> Calculate Mine Feasibilty


 
ZIMBABWE   flag

Kanyemba uranium-vanadium mine project exploration completed

Size: 1800 tonnes U
Ore grade: 0.6% U