HOME   WISE Uranium Project   >   Calculators   >

Tailings Flow Slide Calculator

(last updated 12 Dec 2014)
Requires Firefox 3.5, Internet Explorer 9, or higher. JavaScript must be enabled.
For optional graphical output, the browser must be HTML 5-capable.
For educational purposes only. No warranty.

Determine the extent of a flow slide of liquefied mill tailings.

Select unit first, then enter the parameters and click the "Calculate" button below. HELP

Your browser does not support JavaScript, or you have disabled it.
The Calculator won't work.
Enable JavaScript (Preferences Menu) and reload the page.

 

Units:     Imperial     Metric

        Input Data      
Geometry   HELP
Tailings Properties   HELP
*) = optional

        Output Options      
General Options   HELP
Time step width: sec *)
X step width: *)
    Max. no. of time steps: *)
Min. no. of X steps: *)
Drawing Options   HELP
Max. Y/X ratio: *)
Show bed slope:           Show intermediate contours:
Animation: Time step: sec *)     - or -     Time-lapse factor: *)
*) = optional

 

Flow Slide Depth vs. Distance from Dam Toe

Sorry: HTML 5-capable browser required for graphical output.

          HELP

Results


> See also:

 

HOME   WISE Uranium Project   >   Calculators   >